Upgrading of roof and drainage installation for partial underground building.
- Excavate to required depth for new drainage on mound on top of building.
- Lay industrial heavy duty polythene in trench to form tanking.
- Lay waven coil drainage to direct water to drain point and infill
- Fabrication and installation of balustrades and landscaping


